Showing posts with label FMQ. Show all posts
Showing posts with label FMQ. Show all posts

Friday, August 21, 2015

Wek in Review 2015 - 08/21




Deconstructed Sunrise - 2
8" H x 10" W
The black surround is NOT a border. I have mounted
the quilt on black fabric. This fabric will be turned
under an 8" x 10" canvas and then secured in place
with upholstery tacks. 
Tips, Thoughts and Techniques:

I returned from a family vacation this week, coping with the usual re-entry issues. However, this time it only took a couple of days, versus a week or two to get into the swing of things. Perhaps that is because I got caught up in the busy-ness that is a natural consequence of chairing SAQA's Exhibition Committee. Fortunately it is a committee, so that getting the working done is shared by the members  and does not all fall squarely on my shoulders. I am so appreciative of the help that I receive, that I make it a point to say thank you to individuals and to the committee as a whole on a fairly regular basis. It occurred to me as we "swapped" thank you notes this week, how differently I feel about sending and receiving thanks now from when I was a child. It was the practice in our home that the day after Christmas was time to start writing thank you notes. Pure torture as a child. How should I thank Great Aunt Ernie for a hand knit sweater that itched and didn't suit my 8 year old fashion sense? By the time I came into Ernie's life and she into mine, she seemed ancient and frankly rather creepy and repellant to a young child. Now I see the love and generosity of this annual gift. True, I was a most ungracious child when it came to writing thank you notes, but I did develop the motivation to continue the practice. There are so many things in life that we prefer not to do, but do begrudgingly and then eventually wonder what the big deal was all about. I've been thinking much of making art can feel like that. For example, I would gladly skip over the design phase and get right down to working. Time has taught me that I do best with a blueprint. Funny thing, once I buckle down, it really isn't so bad.
The orange "eyeballs" are the Zoodle
design. Boy, can I tell I haven't been
FMQ for three weeks. It will be good to
get back to FMQ on regular basis.

This week has been about buckling down. Here is how it went:

1) Continue the finishing work on Deconstructed Sunrise - Done!

All that is left to do now is to create and attach the label, then add piece to my website. This just might be the earliest I have a completed a deadline piece. The call I plan on entering this piece in has a November 30, 2015 deadline.

2) Deconstructed Sunrise #2 (Due September 8, 2015): - Done!

  •  Finish quilting it. - Done!
  •  Decide whether additional embellishments would help? - Done! Opted not to add them.
  •  Start the finish work. - Done! 


3) Free motion quilting practice. - Done!

I've been playing with some ideas
for my next Deconstructed Sunrise
quilt. This one will be 60" H x 40" W.
It is prudent to have some idea of the
general layout before I begin.
This is my first design attempt.
I've long been a fan of Leah Day's flowing lines free motion quilting motifs for some time now. Right up there with that family of patterns are spirals. So, when Leah came up with Zoodles, a design that incorporates flowing lines and spirals, I naturally had to give it a try.

4) Post the number of days I have worked in my studio in 2015 - 62.5/126

5) Perform a random act of kindness - Done!

Now that I am back to my work week routine with not a single conference call/meeting scheduled for next week, I have high hopes for three solid studio days next week. Here is how I plan on using them:

This is my fourth design attempt
for the next Deconstructed Sunrise.
The mock ups are 15" H x 10" W
1) Finish Deconstructed Sunrise

2) Deconstructed Sunrise #2 (Due September 8, 2015):
  •  Affix the quilt to the canvas
  • Add it my website and FaceBook page
  • Ship it to the gallery
3) Free motion quilting practice. 

4) Post the number of days I have worked in my studio in 2015

5) Perform a random act of kindness 

I am now linking up to two blogs on Fridays. The first is Nina Marie's Off the Wall Fridays and the second is Free Motion Mavericks.

Friday, June 27, 2014

Week in Review 2014 - 06/27




Little Lake Butte des 
Morts in Fall
gets perspective when
the trees are added.
Tips, Thoughts and Techniques:

My life is currently weighted heavily towards the National Bike Challenge. Technically the challenge isn't competitive. It simply encourages participants to get outside and ride regularly. However, if you are naturally competitive (who me?) then it is tempting to ride every day and expand the distance you ride. There is something rewarding about watching those miles add up. It is as addictive as watching a quilt evolve and then observing the quilts stack up over the years. I have no idea how many quilts I have made over 25+ years of quilting, but I am sure it is over two hundred by now. If I had set out with a goal to make two hundred quilts I probably would have quit before I reached ten quilts. The thought would have been too daunting. That is why I focus on just one or two quilts ahead. It is the same with my biking. I cope with one ride at a time. If it is long one then I break it down to just making it to the next ten mile marker. It is not so different from quilting one block at a time or with my art quilts completing one next step. It is only upon looking back that I can see just how far I have come.

This week felt like biking up hill into a head wind. The week is done. I'm tired. I don't have much distance to show for it. Still I did make progress as you can see:

Close up of Little Lake Butte des Morts in Fall

1) Little Lake Butte des Morts in Fall (Due August 3) 

a) Create and attach two tree appliqués - Almost

That certainly sounded easy enough to do, but it wasn't. I had the ingenious idea that I would back the tree versus turn under the seam allowance. How tough could the pillow case turn method be? It turns out very tough when the trees are only one to one and half inches wide. It does give a clean line and a wonderful 3D look though.  

b) Start adding the details such as the cattails, branches and leaves. - Not yet.

2) Wild Apple 12" x 12" Opportunity - (Due August 15)

a) Mat and frame the work. - Not Yet

3) Leah Day  and other free motion quilting projects.

The Wave with an addition of sea foam
a) Baste the face, torso and arms to Express Your Love II. - On hold until the quilts with deadlines are completed.

b) Do Leah Day's Free Motion Quilting lesson or find another FMQ motif to try. - Done!

This week I chose The Wave as my FMQ motif to test and tweak. This is strictly a play/practice piece. If I were to use it on a quilt I would need to practice more off quilt until I could create more consistent echoes of the wave and keep to similar sizes according to the guidelines. On the plus side I did the whole practice piece without a thread break and think my tweak of adding sea foam between the waves is rather effective.

4) LifeBook 2014 - Do the assignments. - Done!

LifeBook 2014
Week 26's assignment
This week's lesson on contour face drawing is what I need and because I need it I had a fair amount of fear about executing it. My two weakest links, in my opinion, are drawing faces and creating depth by understanding where to place highlights and shadows. I still have a long way to go with my drawing skills, but this piece already achieves two things I haven't managed before. First, it accurately portrays the age of the image I used for reference (I usually add decades when I start adding shadows) and there is a bit of a 3D feel with the girl in front of the halo, the crease below her nose dipping in, her nose protruding from her face and her chin jutting out from her neck. 

Usually the reward for making it to the top of the hill is that you it is followed by a little to no effort coast down the hill. Will this be my reward next week? I sure hope so. Here is what I might be breezing past:

1) Little Lake Butte des Morts in Fall (Due August 3) 

a) Finish attaching the two tree appliqués
b) Start adding the details such as the cattails, branches and leaves. 

2) Wild Apple 12" x 12" Opportunity - (Due August 15)

a) Mat and frame the work.

3) Leah Day  and other free motion quilting projects.

a) Baste the face, torso and arms to Express Your Love II. - On hold until the quilts with deadlines are completed.

b) Do Leah Day's Free Motion Quilting lesson or find another FMQ motif to try.

4) LifeBook 2014 - Do the assignments.


I am now linking up to two blogs on Fridays. The first is Nina Marie's Off the Wall Fridays and the second is Free Motion Mavericks.